Bridges
Manchester Arches
- Inline pump foaming and pumping base material.
- Inline pump foaming and pumping base material.
- Foamed concrete filling a void
- foam concrete is a flud material
- foam concrete is a flud material
- Inline pump foaming and pumping base material.
- typical 1 metre vertical lifts
- staged filling and shuttering on consecutive days
- fluid foamed concrete completly filling the void
- Staged shuttering and pour
- Inline pump foaming and pumping base material.
Stanley Bridge
- Sitting and waiting to pump
- foam concrete used to strengthen and support an only bridge structure
- working bridge deck
- pumping uphill is possible.
- completed bridge re-worked.